Compare welding process productivity across SMAW, GMAW, FCAW, and SAW for the same joint
Input Parameters
Weld Metal Required (lb)
Welder Rate (loaded) ($/hr)
Primary Process
SMAW (Stick)
GMAW (MIG)
FCAW (Flux-Core)
SAW (Submerged Arc)
Consumable Cost ($/lb deposited)
Calculate
Results
--
SMAW Total Cost
$
--
GMAW Total Cost
$
--
FCAW Total Cost
$
--
SAW Total Cost
$
Note:
Typical depo rates: SMAW 3-6 lb/hr, GMAW 6-12 lb/hr, FCAW 8-14 lb/hr, SAW 15-40 lb/hr. SAW is most productive but limited to flat/horizontal positions.
Reference
Total Cost = Labor Cost + Consumable Cost Labor Cost = (Weld Metal / Effective Depo Rate) x Hourly Rate Effective Depo Rate = Depo Rate x Operating Factor Consumable = (Weld Metal / Depo Efficiency) x Wire Price