Input Parameters

Results

--
Excavation Volume
in3
--
Filler Metal Required
lbs
--
Approx Electrode Length (3/32)
in
--
Estimated Weld Passes
Note: Always excavate to sound metal. Blend excavation ends with 3:1 taper minimum. Verify complete removal of defect by MT or PT before rewelding per AWS D1.1 Clause 5.25.

Reference

U-Groove area = 2/3 x width x depth V-Groove area = 1/2 x width x depth Rectangular area = width x depth Volume = area x length Weight = volume x density (steel: 0.283 lb/in3) E7018 3/32" deposits ~0.063 in3 per 14" electrode